Electrocoagulation (EC) Optimization

Delayed over a year due to COVID and having faced nearly every possible logistical challenge imaginable, this is probably the most challenging commissioning and optimization I have ever experienced. Thankfully, it looks like we’re nearing the finish line.

This 50 gpm system removes total and dissolved chromium (Cr-tot + Cr VI) from runoff at a steel mill site in the EU. A very challenging project and application during one of the most challenging times in history.

50 GPM electrocoagulation process at an industrial facility in Sweden

Next
Next

Fly the lonely skies